Saturday, March 17, 2012

Boards

Finally got my boards posted. Goal for next project, BLOG MORE EFFICIENTLY










Monday, February 27, 2012

Almost Finished Floor Plans



The are my floor plans starting with the main floor, then the second floor, and last is the basement. The top two floors are almost finished but the basement has room to be expanded. I will have to add a few more mechanical rooms once I figure out the sizes of the HVAC systems

Friday, February 24, 2012

Wall Sections

This are wall sections of the main core of my building. They are composed of concrete with brick on the bottom layer and then glass curtain walls the rest of the way up. The red columns provide support for the roof, which holds up the curtain walls.

Wednesday, February 15, 2012

Informal Pin up


The top image is showing my process and how my building has evolved. The lower image shows the supports.

Wednesday, February 8, 2012

Floor Plans

Finally I have a rough set of floor plans that are helping me visualize how my building will work. My focus will now shift to getting a neater/ more finalized set of plans and elevations. The next major challenge for me will be how to design and layout the brick work. It needs to reflect the elegance that the curtain wall core has.

Monday, January 30, 2012

Initial Design Proposal

Out of the previous three design solutions, this seems to be the most favorable. The inspiration behind the design comes straight from the sugar beet. Just like the root/the beet is the featured part, the labs are featured in my design. All circulation throughout the building occurs around the labs. They are sunk down one story into the ground and surrounded by glass so that passerbys can look down and see whats happening.