Friday, May 4, 2012

Final Boards




These are my final boards for my my microbrewery/urban infill assignment.


Friday, April 13, 2012

Process


Here are a few different case studies and different design options that I like and think would work well with my microbrewery. The bottom is my initial design concept featuring glass curtain walls on the east wall and the first floor of the north wall. Featured on the North wall will be copper distills.

Saturday, March 17, 2012

Boards

Finally got my boards posted. Goal for next project, BLOG MORE EFFICIENTLY










Monday, February 27, 2012

Almost Finished Floor Plans



The are my floor plans starting with the main floor, then the second floor, and last is the basement. The top two floors are almost finished but the basement has room to be expanded. I will have to add a few more mechanical rooms once I figure out the sizes of the HVAC systems

Friday, February 24, 2012

Wall Sections

This are wall sections of the main core of my building. They are composed of concrete with brick on the bottom layer and then glass curtain walls the rest of the way up. The red columns provide support for the roof, which holds up the curtain walls.

Wednesday, February 15, 2012

Informal Pin up


The top image is showing my process and how my building has evolved. The lower image shows the supports.